Subotička 21, 11000 Belgrade, Serbia

Mon - Sat 8.00 - 16.00 Sunday - Closed

CONCRETE WORKS AND REINFORCED CONCRETE WORK


In order for the building to be stable and safe, construction is necessary. The construction must be based on the appropriate foundations and the concreting starts in the phase of earthworks. Our company is qualified to do all necessary work in the preparation and execution of concrete and reinforced concrete works.

- Concreting of sub-base
- Concreting of all types of foundations, with the necessary reinforcement B500.
- waterproof concrete with addition of additives for the required waterproofing, with the required reinforcement B500.
- Concreting of flat, slanted slabs, pieces of staircase boards, or plates on the ground and interconnected structures, with the necessary reinforcement B500
- concrete beams and pillars, with the required reinforcement B500
- concrete walls, with the required reinforcement B500
- printed concrete

Certificates

Acknowledgement of credibility
and professionalism.

Excellent

ISO 9001, 14001, 18001

ISO 22301

ISO 27001

ISO 50001